The best additions don't look like additions. They look like the original architect always intended that wing, that ADU, that second-story primary suite to be there.
We work closely with architects on every addition and ADU to ensure rooflines, window proportions, exterior cladding, and interior trim all read as one continuous home — not a host structure with a tumor.
We assess setbacks, lot coverage, sewer capacity, and ADU eligibility. You get a clear read on what your property will allow within two weeks.
We work with architects who specialize in additions and ADUs to maximize footprint within regulations. Permits typically 8–16 weeks.
Excavation, foundation, framing, and roof — the structural envelope. Typically 12–20 weeks for an addition or detached ADU.
Interior finish, exterior cladding, utility connections, and inspection. ADU clients receive a rental-readiness checklist at handover.